Enter the size of your house and get a rough building cost in ngultrum. It uses the Bhutan Schedule of Rates 2025 figure for Thimphu.
Rough building cost
Nu 48.9 lakh to Nu 66.2 lakh
The building itself, at the BSR 2025 Thimphu rate of Nu 9,556 per sq m for each metre of ceiling height. The range is the middle figure plus or minus 15%.
Not includedLand, drawings and approvals, site work like retaining walls, roads and septic tanks, furniture, taxes and loan interest. Prices outside Thimphu can be different.
The Simple and Premium buttons are our own rough adjustment (15% less, 30% more). Always get a proper quote from an engineer or contractor before you build.
Your building cost of Nu 57,53,112 split into the six stages of a normal RCC house, with roughly how long each takes. Use it to plan when you need the money. The split is a typical planning guide, not a bill of quantities.
About 14 months of building once drawings are approved (weather, materials and labour can add more).
Add the costs outside the building itself. Leave a box empty if it doesn't apply. All amounts in Nu.
See your monthly repayment. Use the interest rate your own bank gives you; 9% is only an example.
Plan your rooms first. The planner works out the area and sends it here.
Plan my roomsFor about 2,400 sq ft of building. Add 5 to 10% for waste.
Rough planning figures for a concrete-frame house. Your engineer's drawings and bill of quantities give the real amounts. Hilly sites, weak soil and big spans need more steel and concrete.
See each stage from drawings to handover, how long it takes, and the papers your thromde or dzongkhag office asks for.
Open the building guideUsing the Bhutan Schedule of Rates 2025, a standard house in Bhutan costs roughly Nu 9,556 per sq m of plinth area for each metre of ceiling height, before land, approvals and site work. Enter your own size and finish above for a range based on your plan.
The building itself: structure, walls, roof, standard plaster, flooring, electrical and plumbing points, at the Bhutan Schedule of Rates 2025 standard finish. It does not include land, architectural drawings and approvals, site work such as retaining walls, roads or septic tanks, furniture, taxes or loan interest.
Costs vary with site conditions, finish choices and the contractor you use, so the tool shows the BSR middle figure plus or minus 15% as a realistic range, not a fixed quote.
The materials table below gives planning quantities per square foot, based on a standard 1,000 sq ft RCC house. Your engineer's bill of quantities will give the exact amounts for your design.
A two-floor home of 1,500 to 2,500 sq ft usually takes 12 to 18 months from approved drawings to handover, covering foundation, frame, walls and roof, plumbing and electrical, plaster and flooring, and finishing. See the full stage-by-stage guide for details.