Free guide · Build in Bhutan

Building a house, step by step

How much cement, steel, sand and bricks you need, how long each stage takes, and what you need for approval.

Plan my roomsWork out the cost
Materials you will need

For about 1,438 sq ft of building. Add 5 to 10% for waste.

CementFor concrete, brick work and plaster503 to 647bags (50 kg)
Steel (TMT bars)For columns, beams and slabs4,310 to 5,750kg
SandFor concrete, mortar and plaster1,730 to 2,300cubic ft
Aggregate (stone chips)For concrete2,160 to 2,880cubic ft
BricksFewer if you use bigger concrete blocks11,500 to 14,380bricks
Floor tilesIncludes cutting waste1,440 to 1,580sq ft
Wall tilesKitchen and bathrooms719 to 1,150sq ft
Paint (primer, inside, outside)173 to 259litres
Wall putty719 to 1,150kg
Electrical pointsSwitches, sockets and lights86.3 to 129points
Plumbing pointsTaps, toilets, basins, drains28.8 to 50.3points

Rough planning figures for a concrete-frame house. Your engineer's drawings and bill of quantities give the real amounts. Hilly sites, weak soil and big spans need more steel and concrete.

Building stages and time
  1. 1Plan, design and approval1 to 3 months (sometimes 3 to 6)Architect and engineer draw the plans. Submit to your thromde or dzongkhag and wait for approval.
  2. 2Site preparation and marking5 to 15 daysClear the plot, check the soil, mark where columns and walls go.
  3. 3Foundation15 to 45 daysDig, then pour footings and plinth beam. Water the concrete well so it cures.
  4. 4Frame: columns, beams and slabs2 to 4 monthsOne floor at a time. Each slab must cure properly before the next one is cast.
  5. 5Walls and roof1 to 2 monthsBrick or block walls, door and window frames, then the roof.
  6. 6Electrical and plumbing15 to 30 daysPipes and wires go inside the walls before plaster.
  7. 7Plaster and flooring1 to 2 monthsPlaster inside and outside, then lay tiles or wooden floors.
  8. 8Painting and finishing1 to 3 monthsPutty, paint, doors, kitchen, bathroom fittings, traditional wood work.
  9. 9Final check and handover7 to 15 daysFix snags, clean up, and get the final inspection.

A two-floor home of 1,500 to 2,500 sq ft usually takes 12 to 18 months from start to finish. Monsoon, material delays and labour shortages can add more.

Getting approval in Thimphu

What Thimphu Thromde asks for. Other thromdes and dzongkhags have their own steps, so ask your local office.

Documents
  • Application form
  • Latest land ownership certificate (lagthram)
  • Certificate of your design team
  • 2 sets each of architectural, structural and electrical drawings
  • 2 sets of water supply and sewerage drawings
Steps
  1. Submit at Customer Care and pay the Nu 100 registration fee.
  2. A thromde architect checks your drawings, then the structural and electrical engineers.
  3. Get power clearance from BPC and hand it in at Customer Care.
  4. Pay scrutiny and other fees and collect your approval letter.

Refundable security deposit: Nu 50,000. Time: about 23 working days if the drawings meet all the rules. Contact: customercare@tto.gov.bt, 02-333391.

Send this to someone building

Facebook Telegram
Common questions
How many cement bags do I need to build a house in Bhutan?

It depends on the total built-up area (all floors added together). Enter your total size above and the materials table gives you an estimate for cement, bricks, steel and sand together.

How long does it take to build a house in Bhutan?

Total time depends on the size, the number of floors and how the stages (foundation, structure, roofing, finishing) are scheduled; the stage-by-stage breakdown on this page shows what each stage covers.

What approvals do I need to build in Thimphu?

Thimphu Thromde has its own approval process and paperwork before construction starts; see the approval section on this page for what is typically required, and confirm the current requirements with the Thromde directly since rules can change.

Do I need a licensed architect or engineer?

Yes. This guide and the planning tools on Dragon Super App are for working out rough numbers and talking points; the actual building drawing and structural design must come from a licensed architect or engineer, and the Thromde or dzongkhag must approve it.

I don't know my house's exact size yet — what do I do?

Use the house plan tool first to lay out your rooms and get a total area, or the house cost tool to estimate by floor area and floors; both link back here with your numbers already filled in.

Need people to build it?

Find masons, carpenters and site supervisors on Dragon, or post a job free and let them come to you.

Find workers Post a job free
Are you a builder, architect or supplier? Get customer requests

More free home tools