Free tool · Build in Bhutan

How much will my house cost?

Enter the size of your house and get a rough building cost in ngultrum. It uses the Bhutan Schedule of Rates 2025 figure for Thimphu.

Rough building cost

Nu 29.3 lakh to Nu 39.6 lakh

Middle figure Nu 34,47,073 for 1,438 sq ft in total, about Nu 2,397 per sq ft.
What this includes

The building itself, at the BSR 2025 Thimphu rate of Nu 9,556 per sq m for each metre of ceiling height. The range is the middle figure plus or minus 15%.

Not included

Land, drawings and approvals, site work like retaining walls, roads and septic tanks, furniture, taxes and loan interest. Prices outside Thimphu can be different.

The Simple and Premium buttons are our own rough adjustment (15% less, 30% more). Always get a proper quote from an engineer or contractor before you build.

Share your estimate

Where your money goes, stage by stage

Your building cost of Nu 34,47,073 split into the six stages of a normal RCC house, with roughly how long each takes. Use it to plan when you need the money. The split is a typical planning guide, not a bill of quantities.

1. Foundation and plinthDigging, footings, plinth beam, damp-proofingMonth 1 to 2
Nu 5.2 lakh
15%
2. Frame: columns, beams and slabsSteel, shuttering and concrete floor by floorMonth 3 to 6
Nu 8.6 lakh
25%
3. Walls and masonryBrick or block walls, lintels, door and window framesMonth 7 to 8
Nu 4.1 lakh
12%
4. RoofRoof frame and CGI sheet roofing, guttersMonth 9 to 10
Nu 3.4 lakh
10%
5. Plumbing and electricalPipes, tanks, wiring, switch boards, earthingMonth 10 to 11
Nu 4.5 lakh
13%
6. Plaster, floors and finishingPlaster, tiles, paint, doors, windows, fittings, wood workMonth 12 to 14
Nu 8.6 lakh
25%

About 14 months of building once drawings are approved (weather, materials and labour can add more).

Your whole project budget

Add the costs outside the building itself. Leave a box empty if it doesn't apply. All amounts in Nu.

Building: Nu 34,47,073Buffer (10%): Nu 3,44,707Total project: Nu 37,91,780
Can I afford it? Loan check

See your monthly repayment. Use the interest rate your own bank gives you; 9% is only an example.

Loan needed: Nu 37,91,780Nu 38,459 a monthTotal paid back over 15 years: about Nu 69.2 lakh (Nu 31.3 lakh interest). Banks also look at your income, so check with them before you start.
Not sure of the size yet?

Plan your rooms first. The planner works out the area and sends it here.

Plan my rooms
Materials you will need

For about 1,438 sq ft of building. Add 5 to 10% for waste.

CementFor concrete, brick work and plaster503 to 647bags (50 kg)
Steel (TMT bars)For columns, beams and slabs4,310 to 5,750kg
SandFor concrete, mortar and plaster1,730 to 2,300cubic ft
Aggregate (stone chips)For concrete2,160 to 2,880cubic ft
BricksFewer if you use bigger concrete blocks11,500 to 14,380bricks
Floor tilesIncludes cutting waste1,440 to 1,580sq ft
Wall tilesKitchen and bathrooms719 to 1,150sq ft
Paint (primer, inside, outside)173 to 259litres
Wall putty719 to 1,150kg
Electrical pointsSwitches, sockets and lights86.3 to 129points
Plumbing pointsTaps, toilets, basins, drains28.8 to 50.3points

Rough planning figures for a concrete-frame house. Your engineer's drawings and bill of quantities give the real amounts. Hilly sites, weak soil and big spans need more steel and concrete.

Building stages, time and approval

See each stage from drawings to handover, how long it takes, and the papers your thromde or dzongkhag office asks for.

Open the building guide
Common questions
How much does it cost to build a house in Bhutan?

Using the Bhutan Schedule of Rates 2025, a standard house in Bhutan costs roughly Nu 9,556 per sq m of plinth area for each metre of ceiling height, before land, approvals and site work. Enter your own size and finish above for a range based on your plan.

What does this estimate include?

The building itself: structure, walls, roof, standard plaster, flooring, electrical and plumbing points, at the Bhutan Schedule of Rates 2025 standard finish. It does not include land, architectural drawings and approvals, site work such as retaining walls, roads or septic tanks, furniture, taxes or loan interest.

Why does my estimate show a range instead of one number?

Costs vary with site conditions, finish choices and the contractor you use, so the tool shows the BSR middle figure plus or minus 15% as a realistic range, not a fixed quote.

How much cement, steel and bricks will I need?

The materials table below gives planning quantities per square foot, based on a standard 1,000 sq ft RCC house. Your engineer's bill of quantities will give the exact amounts for your design.

How long does building a house take?

A two-floor home of 1,500 to 2,500 sq ft usually takes 12 to 18 months from approved drawings to handover, covering foundation, frame, walls and roof, plumbing and electrical, plaster and flooring, and finishing. See the full stage-by-stage guide for details.

Need people to build it?

Find masons, carpenters and site supervisors on Dragon, or post a job free and let them come to you.

Find workers Post a job free
Are you a builder, architect or supplier? Get customer requests

More free home tools